IEEE/NIST Timing Challenges in the Smart Grid Workshop

Dr. Rick Blum recently spoke at the IEEE-SA/NIST Timing Challenges in Smart Grid Workshop.

Background –
Dynamic distributed measurement and control systems are time sensitive. In distributed control where scheduling of resources, seamlessly orchestrated coordination, and hard deadlines; must be met, measurement data, state estimators and control commands are temporally valid for a specific, sometimes brief, duration. In order to provide the common time reference for correct temporal behavior, all systems must be synchronized to a traceable time and frequency source.

In the North American power grid, where each interconnection stretches over a large spatial expanse, achieving correct timing can be challenging. Timing needs include one microsecond synchronization to a traceable time and frequency reference for data fusion. Issues include, but are not limited to, GPS and communication infrastructure as well as concerns for reliability and resilience; if a reference source becomes unavailable.

Read full article

Latest News

UA Power Group to Host MUSiC Topping Off Ceremony

UA Power Group to Host MUSiC Topping Off Ceremony

The UA Power Group prepares to mark a significant milestone in the construction of its newest MUSiC facility. Students and faculty will gather at the construction site to sign the final beam before it's raised into place. This ceremony symbolizes the dedication and...

read more