IEEE/NIST Timing Challenges in the Smart Grid Workshop

Dr. Rick Blum recently spoke at the IEEE-SA/NIST Timing Challenges in Smart Grid Workshop.

Background –
Dynamic distributed measurement and control systems are time sensitive. In distributed control where scheduling of resources, seamlessly orchestrated coordination, and hard deadlines; must be met, measurement data, state estimators and control commands are temporally valid for a specific, sometimes brief, duration. In order to provide the common time reference for correct temporal behavior, all systems must be synchronized to a traceable time and frequency source.

In the North American power grid, where each interconnection stretches over a large spatial expanse, achieving correct timing can be challenging. Timing needs include one microsecond synchronization to a traceable time and frequency reference for data fusion. Issues include, but are not limited to, GPS and communication infrastructure as well as concerns for reliability and resilience; if a reference source becomes unavailable.

Read full article

Latest News

UA Power Group Featured at SEMICON West

UA Power Group Featured at SEMICON West

The University of Arkansas Power Group represented the University of Arkansas at SEMICON West in October, engaging with industry leaders and showcasing its research, facilities, and industry partnerships in power electronics and semiconductor technologies. Coverage of...

read more